FLEXX R32 Installation & Airflow
Now Available On Demand

Training Agenda: 

  • 24-Volt Control System Setup
  • Blower Configuration
  • Static Pressure Measurement
  • A2L Shutdown with 24-Volt Control
  • Operation of GREE Wired Controller

We willl also answer audience questions live. 

Fill out the form to register.

 

 

 

   

 

login now

(or register)

First (required)

Last (required)

(required)

(required)

Distributor  
Contractor  
GREE Rep  
GREE Employee  
Other  

(required)

(required)

(required)

(required)

Privacy Policy